SYSTEM SW / 2026-08-17 / BSP & OS release
Arvenna 첫 드롭 결과와 전원 드라이버 지연에 관한 주간 벤더 회의
Atlas 개발 공식 시작일에 열린 주간 벤더 회의입니다. 8월 14일 도착한 BSP 0.5의 하드웨어 검증 결과, 6.12 개발 브랜치 상태, 그리고 전원 관리 드라이버 재작업으로 BSP 1.0이 일주일 늦어질 위험을 놓고 프로그램 관리, 커널·BSP, 플랫폼 프레임워크, Arvenna가 드롭 분할 방안을 논의합니다.
가상의 비즈니스 회의 · 중급~고급 · 2,213단어 · 약 18분
Good afternoon from Seoul, and good morning to Stockholm. Welcome to the weekly vendor sync. Today is a milestone in itself: it's the official start of Atlas development. Rachel from Platform Framework is joining us today, because one of the topics affects her team directly. Let's start with the review of BSP 0.5, then the development branch, and then the outlook for 1.0.
Good morning, everyone. Before we start, I want to say thank you for the clear feedback in the first two weeks. It's made our internal planning much easier.
Hi, everyone. Rachel from Framework. I'm here mainly to understand when the camera and audio pieces will land, since my team's September plan depends on them.
Daniel, how did BSP 0.5 go?
Overall, it's a solid first drop, and it arrived on time on the fourteenth, which I want to acknowledge. As agreed, we used it only for hardware validation on the evaluation boards. Display, storage, and USB all came up on the first day. The kernel console and Android shell work as described in the release notes. And the known issues list was accurate, which saved us a lot of time.
That's good to hear. We put a lot of effort into the release notes after the feedback on Orion.
It shows. There is one significant hardware validation issue, though. Memory training passes at the lower speed setting on all six boards, but at the full speed of 6400, it fails on two of the six. When it fails, the board doesn't boot at all. We've swapped the memory parts and the problem stays with the boards, not the parts.
That's useful, and I haven't heard of it from other customers. Could you send us the training logs from the bootloader for both failing boards? Our memory team can tell a lot from the per-lane results. It could be a board-level signal integrity issue, or it could be a training parameter that's too tight for some boards.
I'll send them today. I'd also like to know whether the same failure could happen on our proto hardware, which arrives next week. If the training margins are tight on your evaluation board, they could be even tighter on our layout.
Good point. I'll ask our memory team to prioritize this, because a proto board that can't run memory at full speed would block your first boot milestone. I'll come back with an initial assessment by Wednesday.
Next, the 6.12 development branch. Sora, how's it going?
Access came through on August 11th, one day later than planned, which is fine. The branch boots on the evaluation board most of the time, and two of our engineers have been porting our display and charging drivers against it. Our main problem is that suspend and resume don't work at all. The board goes into suspend, but it never wakes up. That blocks any battery or standby testing.
That's a known issue on the development branch, and it's actually connected to the 1.0 discussion. Our power management controller driver for 6.12 is still being reworked. The current version on the branch doesn't correctly restore the controller's state after resume, so the wake-up interrupt never reaches the CPU.
We also used the hot fix channel for the first time last week. We filed three blockers, and two came back with fixes within two working days, which is exactly what we agreed. The third is the suspend issue, which I understand is the bigger topic.
Let me be direct about it, since we agreed to give at least a week's warning. The power management rework is behind. Our current estimate is that the full 1.0 drop, including the reworked power driver, would ship on September 18th instead of September 11th. That's one week, which I know is exactly five working days, the threshold for your escalation trigger.
Thank you for raising it now rather than on September 10th. That's exactly the behavior I asked for. Before we decide anything, let's understand the impact. Daniel, Rachel, what does a one-week slip of 1.0 mean for each of you?
For kernel, our next milestone is the home screen on proto hardware by September 21st. That needs display, touch, storage, and a stable kernel on 6.12, but it doesn't strictly need suspend and resume. So, technically, we could reach the home screen without the reworked power driver, as long as we keep the device awake.
For framework, the problem is different. What I need from 1.0 is the camera and audio hardware abstraction layers. If those slip a week along with the power driver, my team loses a week of camera integration, and camera is the biggest feature on Atlas. I'm much more worried about camera and audio than about suspend.
So the two teams need different things from 1.0, and only one of those things is late. Priya, are camera and audio on track for September 11th?
Yes. Camera and audio are in final testing, and they're independent of the power driver rework. If we had the option, we could ship them on the eleventh as planned.
Then let's create that option. Split 1.0 into two drops: 1.0 on September 11th with the move to 6.12, camera, and audio, but with the current power driver and suspend as a known issue. Then 1.0.1 on September 18th with only the reworked power driver. Rachel gets camera on time, we get our home screen milestone, and suspend follows a week later.
That's feasible from a release perspective. My only concern is testing cost on our side. Each drop goes through four days of regression testing. Two drops in one week means our test team runs back to back. It's doable, but I want to be honest that it stretches them.
Could 1.0.1 be a smaller test cycle? If it only changes the power driver, a full four-day regression seems like overkill. A targeted run on power, thermal, and suspend tests might be enough, and we'd do our own broader testing when it lands.
That's a reasonable proposal. I'd still want to run our boot and stability smoke tests, because the power driver touches early boot. But that's one day, not four.
Then the question for me is the escalation trigger. Formally, the full 1.0 is late by five working days. But if we split the drop, nothing that blocks a milestone is late. I'd propose we don't trigger a formal replan, but I'll document the split and the reasoning in the risk register. Marco, does that work for you?
It does, and I appreciate the flexibility. I'd ask one thing in return: if 1.0.1 slips past the eighteenth, we treat that as a formal escalation without debate. I'd rather have a clear line than a negotiation every time.
Agreed. That's fair to both sides.
One condition from kernel's side. Please make sure 1.0 doesn't include a half-finished version of the new power driver. I'd much rather have the old, known driver with suspend broken than a partially reworked one with new, unknown behavior. Mixing the two would make every power bug we see in September ambiguous.
Understood. 1.0 will contain exactly the same power driver as the current development branch, and the release notes will say so explicitly. All of the rework lands together in 1.0.1.
Let's look ahead to the proto hardware. Daniel, what's your plan for the first week once the boards arrive on the twenty-fourth?
Day one is power-on and bootloader. If memory training passes at full speed, we move straight to the kernel console with the 0.5 BSP, since that's the most stable kernel we have. In parallel, we try the 6.12 development branch. Our goal is a kernel console on 6.12 by September 7th, as planned, but having 0.5 as a fallback means we can validate the hardware even if 6.12 has problems.
One suggestion: if you hit memory training problems on the proto boards, try the lower speed setting first to confirm everything else works, and send us the logs immediately. We can often provide adjusted training parameters within a day or two.
And on my side, the extra evaluation boards from Sora's request arrived on Friday, so my team now has six. That's enough to start camera integration as soon as 1.0 lands on September 11th, without waiting for proto hardware.
Good. For what it's worth, I'd recommend your team installs the development branch on two of those boards now, so you can start compiling the framework against the new kernel headers. That way, when 1.0 arrives, the only new thing is the camera stack itself.
Since development officially starts today, I'd like to agree on how our two companies work together day to day during bring-up. A weekly sync is fine for planning, but when a board doesn't boot at eleven at night in Seoul, nobody wants to wait until Monday. What's the fastest way for Daniel's team to reach the right person at Arvenna?
For bring-up, we usually set up a shared chat channel with our core engineers on it, in addition to the ticket portal. The rule is that anything blocking a board goes into the channel immediately with a short summary, and then gets a ticket for tracking. Our engineers in Stockholm start their day when it's mid-afternoon in Seoul, so there's a few hours of overlap every day.
That works well for us. The overlap is mostly our afternoon and their morning. What I'd ask is that we hand over clearly at the end of each Seoul day: a short note in the channel saying what's blocked, what we've tried, and which logs are attached. That way, Priya's team can work on it during their day, and we get answers when we come in the next morning.
I like that follow-the-sun approach. It's how we worked with another customer in Taipei, and it effectively gave us almost two working days per calendar day during critical weeks. The key is the quality of the handover note. If it's vague, we lose a whole cycle asking questions.
I can write a short template for the handover note: board identifier, build number, symptom, steps already tried, and links to logs. It sounds bureaucratic, but it saves a lot of back and forth.
Could framework engineers join that channel too, once we start camera integration? Camera issues often turn out to be in the hardware abstraction layer, and it would be faster to ask Arvenna directly than to route everything through kernel.
Of course. I'd suggest a separate thread for camera and audio, so the kernel discussions don't get buried. I'll add our camera and audio engineers to the channel before 1.0 lands.
Perfect. Then the weekly sync stays for planning and decisions, and the channel is for day-to-day unblocking. Sora's template becomes the standard for handovers.
One more question while I'm here. Kevin from Google sent the partner timeline, which says the last developer preview is in October and the final release in early December. Does Arvenna's 1.1 drop on October 9th target the developer preview, or the version before it?
It targets the last developer preview, assuming Google publishes it in early October as usual. If Google is late, we'd ship 1.1 against the previous preview and follow up with an update. We've had to do that before, and it's manageable.
Good. I'll add that dependency to the plan. Kevin offered to join these calls when there's a platform topic, so I'll invite him in early October.
Let me summarize. BSP 1.0 is split. 1.0 ships on September 11th with kernel 6.12, camera, and audio, and suspend as a known issue. 1.0.1 ships on September 18th with the reworked power driver, with a one-day smoke test on Arvenna's side. No formal replan, but if 1.0.1 slips past the eighteenth, that's an automatic escalation. Actions: Sora sends the memory training logs today. Marco returns an initial memory assessment by Wednesday. Priya updates the drop plan and known issues on the portal. Rachel's team sets up the development branch on two evaluation boards. And I update the risk register.
Understood. I'll have the updated plan on the portal by tomorrow morning, your time.
And I'll share our first-week proto plan with Priya, so her team knows what we'll be testing and can be ready for questions.
Thank you, everyone. This is a good example of how early warning turns a potential slip into a manageable plan. Our next sync is Monday, August 24th, at 4 p.m. Korea time, which is the day the proto boards arrive, so it might be an exciting one.
Let's hope it's exciting in a good way. Thanks, Hyejin. I'll make sure our memory engineer is in the channel on the twenty-fourth, just in case the proto boards behave like the two evaluation boards did. If they do, we'll want to look at the training logs while your team is still in the lab.
Thanks, everyone. I'm glad I joined; this changed my September plan for the better.
서울에서는 오후, 스톡홀름에는 아침 인사드립니다. 주간 벤더 회의에 오신 걸 환영합니다. 오늘은 그 자체로 이정표인데, Atlas 개발의 공식 시작일이거든요. 안건 하나가 플랫폼 프레임워크팀에 직접 영향을 주기 때문에 오늘은 Rachel도 참석했습니다. BSP 0.5 검토부터 시작하고, 개발 브랜치, 그다음 1.0 전망 순서로 하겠습니다.
모두 좋은 아침입니다. 시작하기 전에, 첫 2주 동안 명확한 피드백을 주셔서 감사하다는 말씀을 드리고 싶습니다. 덕분에 저희 내부 계획이 훨씬 쉬워졌습니다.
안녕하세요, 프레임워크팀 Rachel입니다. 저희 팀 9월 계획이 카메라와 오디오 부분에 달려 있어서, 주로 그게 언제 들어오는지 알아보려고 왔습니다.
Daniel, BSP 0.5는 어땠나요?
전체적으로 탄탄한 첫 드롭이었고, 14일에 제때 도착했다는 점을 인정하고 싶습니다. 합의한 대로 평가 보드에서 하드웨어 검증 용도로만 썼습니다. 디스플레이, 스토리지, USB 모두 첫날 올라왔습니다. 커널 콘솔과 안드로이드 셸은 릴리스 노트에 설명된 대로 동작합니다. 그리고 알려진 이슈 목록이 정확해서 시간을 많이 아꼈습니다.
반가운 소식이네요. Orion 때 받은 피드백 이후 릴리스 노트에 많은 공을 들였습니다.
그게 보입니다. 다만 중요한 하드웨어 검증 이슈가 하나 있습니다. 메모리 트레이닝이 6개 보드 모두에서 낮은 속도 설정으로는 통과하지만, 최대 속도인 6400에서는 6개 중 2개에서 실패합니다. 실패하면 보드가 아예 부팅되지 않습니다. 메모리 부품을 바꿔 봤는데 문제는 부품이 아니라 보드에 남아 있습니다.
유용한 정보이고, 다른 고객사에서는 들어 본 적이 없습니다. 실패한 두 보드의 부트로더 트레이닝 로그를 보내 주실 수 있나요? 저희 메모리팀은 레인별 결과로 많은 걸 알아낼 수 있습니다. 보드 수준의 신호 무결성 문제일 수도 있고, 일부 보드에는 너무 빡빡한 트레이닝 파라미터일 수도 있습니다.
오늘 보내겠습니다. 그리고 다음 주에 도착하는 저희 프로토 하드웨어에서도 같은 실패가 생길 수 있는지 알고 싶습니다. 귀사 평가 보드에서 트레이닝 여유가 빠듯하다면, 저희 레이아웃에서는 더 빠듯할 수 있으니까요.
좋은 지적입니다. 메모리를 최대 속도로 돌리지 못하는 프로토 보드는 귀사의 첫 부팅 마일스톤을 막을 테니, 메모리팀에 이걸 우선 처리해 달라고 하겠습니다. 수요일까지 초기 평가를 가지고 다시 연락드리겠습니다.
다음은 6.12 개발 브랜치입니다. 소라 님, 어떻게 되고 있나요?
접근 권한은 계획보다 하루 늦은 8월 11일에 나왔는데, 괜찮습니다. 브랜치는 평가 보드에서 대부분 부팅되고, 엔지니어 두 명이 그 기준으로 디스플레이와 충전 드라이버를 포팅하고 있습니다. 주된 문제는 서스펜드와 리줌이 전혀 동작하지 않는다는 겁니다. 보드가 서스펜드에 들어가지만 절대 깨어나지 않습니다. 그 때문에 배터리나 대기 테스트를 전혀 할 수 없습니다.
그건 개발 브랜치의 알려진 이슈이고, 사실 1.0 논의와 연결돼 있습니다. 6.12용 전원 관리 컨트롤러 드라이버는 아직 재작업 중입니다. 브랜치의 현재 버전은 리줌 후 컨트롤러 상태를 제대로 복원하지 못해서, 깨우기 인터럽트가 CPU에 도달하지 못합니다.
그리고 지난주에 핫픽스 채널을 처음 써 봤습니다. 블로커 3건을 등록했는데, 2건은 합의한 대로 정확히 영업일 2일 안에 수정이 돌아왔습니다. 세 번째가 서스펜드 이슈인데, 그게 더 큰 주제인 걸로 압니다.
최소 일주일 전에 경고하기로 합의했으니 직접적으로 말씀드리겠습니다. 전원 관리 재작업이 늦어지고 있습니다. 현재 추정으로는 재작업된 전원 드라이버를 포함한 1.0 전체 드롭이 9월 11일이 아니라 9월 18일에 나갈 것 같습니다. 일주일인데, 그게 정확히 영업일 5일이고, 귀사 에스컬레이션 트리거 기준이라는 걸 압니다.
9월 10일이 아니라 지금 알려 주셔서 감사합니다. 제가 요청했던 게 바로 그런 행동이에요. 뭔가를 결정하기 전에 영향을 이해합시다. Daniel, Rachel, 1.0이 일주일 밀리면 각자에게 어떤 의미인가요?
커널 쪽에서 다음 마일스톤은 9월 21일까지 프로토 하드웨어에서 홈 화면을 띄우는 겁니다. 그러려면 디스플레이, 터치, 스토리지, 그리고 6.12 기반의 안정적인 커널이 필요하지만, 서스펜드와 리줌이 꼭 필요하지는 않습니다. 그러니 기술적으로는 단말을 깨어 있는 상태로 유지하면 재작업된 전원 드라이버 없이도 홈 화면에 도달할 수 있습니다.
프레임워크 쪽은 문제가 다릅니다. 제가 1.0에서 필요한 건 카메라와 오디오 HAL입니다. 그게 전원 드라이버와 함께 일주일 밀리면 저희 팀은 카메라 통합을 일주일 잃게 되는데, 카메라는 Atlas에서 가장 큰 기능입니다. 저는 서스펜드보다 카메라와 오디오가 훨씬 걱정됩니다.
그러니까 두 팀이 1.0에서 필요로 하는 게 다르고, 그중 하나만 늦어지는 거군요. Priya, 카메라와 오디오는 9월 11일에 맞춰 진행되고 있나요?
네. 카메라와 오디오는 최종 테스트 중이고, 전원 드라이버 재작업과 무관합니다. 선택권이 있다면 계획대로 11일에 내보낼 수 있습니다.
그럼 그 선택권을 만듭시다. 1.0을 두 드롭으로 나누는 겁니다. 9월 11일 1.0에는 6.12 전환, 카메라, 오디오를 넣되 전원 드라이버는 현재 버전으로 하고 서스펜드는 알려진 이슈로 둡니다. 그다음 9월 18일 1.0.1에는 재작업된 전원 드라이버만 넣고요. Rachel은 카메라를 제때 받고, 저희는 홈 화면 마일스톤을 지키고, 서스펜드는 일주일 뒤에 따라옵니다.
릴리스 관점에서는 가능합니다. 제 유일한 걱정은 저희 쪽 테스트 비용입니다. 드롭마다 4일간 회귀 테스트를 거칩니다. 일주일에 드롭 두 개면 테스트팀이 쉬지 않고 연달아 돌려야 합니다. 할 수는 있지만, 그들에게 부담이 된다는 건 솔직히 말씀드리고 싶습니다.
1.0.1은 더 작은 테스트 사이클로 할 수 있을까요? 전원 드라이버만 바뀐다면 4일짜리 전체 회귀 테스트는 과한 것 같습니다. 전원, 발열, 서스펜드 테스트를 대상으로 한 실행이면 충분할 수도 있고, 들어오면 저희가 더 넓은 범위로 자체 테스트를 하겠습니다.
합리적인 제안입니다. 전원 드라이버가 초기 부팅을 건드리니까 부팅과 안정성 스모크 테스트는 여전히 돌리고 싶습니다. 하지만 그건 4일이 아니라 하루입니다.
그럼 제 입장에서 질문은 에스컬레이션 트리거입니다. 공식적으로 1.0 전체는 영업일 5일 늦습니다. 하지만 드롭을 나누면 마일스톤을 막는 건 하나도 늦지 않습니다. 공식적인 일정 재수립은 하지 않되, 분할과 그 근거를 리스크 레지스터에 기록하자고 제안합니다. Marco, 괜찮으신가요?
괜찮습니다. 유연하게 대해 주셔서 감사합니다. 대신 하나만 요청하겠습니다. 1.0.1이 18일을 넘기면, 논쟁 없이 공식 에스컬레이션으로 처리해 주세요. 매번 협상하는 것보다 명확한 선이 있는 게 낫습니다.
동의합니다. 양쪽 모두에게 공정하네요.
커널 쪽에서 조건 하나 있습니다. 1.0에 반쯤 완성된 새 전원 드라이버가 들어가지 않게 해 주세요. 새로운, 알 수 없는 동작을 하는 부분 재작업 버전보다는 서스펜드가 깨져 있더라도 예전의 익숙한 드라이버가 훨씬 낫습니다. 둘을 섞으면 9월에 보는 모든 전원 버그가 애매해집니다.
알겠습니다. 1.0에는 현재 개발 브랜치와 정확히 같은 전원 드라이버가 들어가고, 릴리스 노트에 그렇게 명시하겠습니다. 재작업 내용은 전부 1.0.1에 한꺼번에 들어갑니다.
프로토 하드웨어를 미리 봅시다. Daniel, 24일에 보드가 도착하면 첫 주 계획이 어떻게 되나요?
첫날은 전원 투입과 부트로더입니다. 메모리 트레이닝이 최대 속도로 통과하면, 지금 가진 가장 안정적인 커널인 0.5 BSP로 바로 커널 콘솔까지 갑니다. 동시에 6.12 개발 브랜치도 시도합니다. 목표는 계획대로 9월 7일까지 6.12에서 커널 콘솔을 띄우는 건데, 0.5를 대안으로 갖고 있으면 6.12에 문제가 있어도 하드웨어를 검증할 수 있습니다.
제안 하나 드리겠습니다. 프로토 보드에서 메모리 트레이닝 문제가 생기면, 먼저 낮은 속도 설정으로 나머지가 다 동작하는지 확인하고, 바로 로그를 보내 주세요. 보통 하루 이틀 안에 조정된 트레이닝 파라미터를 드릴 수 있습니다.
그리고 제 쪽에서는 소라 님이 요청한 추가 평가 보드가 금요일에 도착해서 이제 저희 팀에 6대가 있습니다. 프로토 하드웨어를 기다리지 않고 9월 11일 1.0이 들어오는 대로 카메라 통합을 시작하기에 충분합니다.
좋습니다. 참고로, 지금 그중 두 대에 개발 브랜치를 설치해서 새 커널 헤더 기준으로 프레임워크 컴파일을 시작하길 권합니다. 그러면 1.0이 도착했을 때 새로운 건 카메라 스택 자체뿐이니까요.
오늘 개발이 공식적으로 시작되니까, 브링업 기간 동안 두 회사가 매일 어떻게 협업할지 합의하고 싶습니다. 주간 회의는 계획에는 괜찮지만, 서울 시간 밤 11시에 보드가 부팅되지 않으면 아무도 월요일까지 기다리고 싶지 않을 겁니다. Daniel 팀이 Arvenna의 적임자에게 가장 빨리 연락할 방법이 뭔가요?
브링업 기간에는 보통 티켓 포털과 별도로 저희 핵심 엔지니어들이 들어 있는 공유 채팅 채널을 만듭니다. 규칙은 보드를 막는 건 무엇이든 짧은 요약과 함께 바로 채널에 올리고, 그다음 추적을 위해 티켓을 만드는 겁니다. 스톡홀름 엔지니어들은 서울 시간 오후 중반에 하루를 시작하니까 매일 몇 시간씩 겹치는 시간이 있습니다.
저희에게 잘 맞습니다. 겹치는 시간은 대부분 저희 오후, 그쪽 오전입니다. 제가 요청하고 싶은 건 서울 업무 시간이 끝날 때마다 명확하게 인수인계하는 겁니다. 무엇이 막혀 있고, 무엇을 시도했고, 어떤 로그가 첨부됐는지 채널에 짧게 남기는 거죠. 그러면 Priya 팀이 자기 업무 시간에 그걸 처리하고, 저희는 다음 날 아침 출근해서 답을 받을 수 있습니다.
그 '해를 따라가는' 방식 좋네요. 타이베이의 다른 고객사와 그렇게 일했는데, 중요한 주간에는 사실상 하루에 거의 이틀 치 업무 시간을 얻었습니다. 핵심은 인수인계 노트의 질입니다. 모호하면 질문하느라 한 사이클을 통째로 잃게 됩니다.
인수인계 노트용 짧은 템플릿을 만들 수 있습니다. 보드 식별자, 빌드 번호, 증상, 이미 시도한 단계, 로그 링크요. 관료적으로 들리지만 주고받는 수고를 많이 줄여 줍니다.
카메라 통합을 시작하면 프레임워크 엔지니어들도 그 채널에 참여할 수 있을까요? 카메라 이슈는 HAL에 있는 것으로 밝혀지는 경우가 많아서, 모든 걸 커널을 거치기보다 Arvenna에 직접 묻는 게 더 빠를 겁니다.
물론이죠. 커널 논의가 묻히지 않도록 카메라와 오디오용 별도 스레드를 두자고 제안합니다. 1.0이 들어오기 전에 저희 카메라와 오디오 엔지니어를 채널에 추가하겠습니다.
완벽합니다. 그럼 주간 회의는 계획과 결정을 위해 유지하고, 채널은 일상적인 문제 해결용으로 씁니다. 소라 님의 템플릿을 인수인계 표준으로 하죠.
온 김에 질문 하나 더 할게요. Google의 Kevin이 보낸 파트너 일정에는 마지막 개발자 프리뷰가 10월, 최종 릴리스가 12월 초라고 돼 있습니다. Arvenna의 10월 9일 1.1 드롭은 그 개발자 프리뷰를 목표로 하나요, 아니면 그 전 버전인가요?
평소처럼 Google이 10월 초에 공개한다는 전제로 마지막 개발자 프리뷰를 목표로 합니다. Google이 늦어지면 이전 프리뷰 기준으로 1.1을 내고 업데이트로 후속 조치를 하겠습니다. 전에도 그래야 했던 적이 있고, 감당할 만합니다.
좋습니다. 그 의존성을 계획에 추가하겠습니다. Kevin이 플랫폼 관련 안건이 있으면 이 회의에 참여하겠다고 했으니, 10월 초에 초대하겠습니다.
요약하겠습니다. BSP 1.0은 분할합니다. 1.0은 9월 11일에 커널 6.12, 카메라, 오디오를 포함하고 서스펜드는 알려진 이슈로 둔 채 나갑니다. 1.0.1은 9월 18일에 재작업된 전원 드라이버로 나가며, Arvenna 쪽에서 하루짜리 스모크 테스트를 합니다. 공식적인 일정 재수립은 없지만, 1.0.1이 18일을 넘기면 자동으로 에스컬레이션합니다. 실행 항목입니다. 소라 님은 오늘 메모리 트레이닝 로그를 보내 주세요. Marco는 수요일까지 메모리 초기 평가를 주세요. Priya는 포털의 드롭 계획과 알려진 이슈를 업데이트해 주세요. Rachel 팀은 평가 보드 두 대에 개발 브랜치를 구성해 주세요. 그리고 저는 리스크 레지스터를 업데이트하겠습니다.
알겠습니다. 업데이트된 계획을 귀사 시간으로 내일 오전까지 포털에 올리겠습니다.
그리고 저는 Priya에게 첫 주 프로토 계획을 공유해서, 그쪽 팀이 저희가 무엇을 테스트할지 알고 질문에 대비할 수 있게 하겠습니다.
모두 감사합니다. 조기 경고가 잠재적 지연을 어떻게 관리 가능한 계획으로 바꾸는지 보여 주는 좋은 예였습니다. 다음 회의는 프로토 보드가 도착하는 날인 8월 24일 월요일 한국 시간 오후 4시이니, 흥미진진할 수도 있겠네요.
좋은 의미로 흥미진진하길 바랍니다. 고마워요, 혜진 님. 프로토 보드가 그 평가 보드 두 대처럼 동작할 경우에 대비해, 24일에는 저희 메모리 엔지니어가 채널에 있도록 하겠습니다. 그렇다면 귀사 팀이 아직 랩에 있는 동안 트레이닝 로그를 보고 싶을 테니까요.
모두 감사합니다. 참석하길 잘했네요. 덕분에 9월 계획이 더 좋아졌어요.
그 자체로 하나의 이정표 · 특정 날짜나 사건이 의미 있는 시점임을 강조할 때
Today is a milestone in itself: it's the official start of Atlas development.
응용 연습
Getting the first boot log was a milestone in itself.
인정하고 싶다, 짚어 두고 싶다 · 상대의 좋은 성과를 공식적으로 인정할 때
Overall, it's a solid first drop, and it arrived on time on the fourteenth, which I want to acknowledge.
응용 연습
I want to acknowledge how quickly the vendor turned this around.
티가 난다, 결과에 드러난다 · 상대의 노력이 결과물에서 보인다고 칭찬할 때
It shows.
응용 연습
You clearly spent time on the documentation. It shows.
보드 쪽에 남아 있다 · 부품 교체 실험으로 문제의 위치를 좁혔을 때
We've swapped the memory parts and the problem stays with the boards, not the parts.
응용 연습
We swapped the batteries, and the drain stays with the device.
(승인·자료 등이) 도착했다 · 기다리던 권한이나 자료를 받았을 때
Access came through on August 11th, one day later than planned, which is fine.
응용 연습
The signing keys came through this morning.
직접적으로 말씀드리겠다 · 좋지 않은 소식을 돌려 말하지 않겠다고 할 때
Let me be direct about it, since we agreed to give at least a week's warning.
응용 연습
Let me be direct about it: we won't make Friday.
바로 제가 요청했던 행동 · 상대가 약속대로 행동했을 때 긍정적으로 강화할 때
That's exactly the behavior I asked for.
응용 연습
You flagged the risk early; that's exactly the behavior I asked for.
꼭 필요하지는 않다 · 필수 조건과 그렇지 않은 조건을 구분할 때
That needs display, touch, storage, and a stable kernel on 6.12, but it doesn't strictly need suspend and resume.
응용 연습
The demo doesn't strictly need the modem.
그 선택지를 만들어 보자 · 기존에 없던 대안을 적극적으로 설계하자고 할 때
Then let's create that option.
응용 연습
If splitting the build helps, let's create that option.
연달아, 쉬지 않고 · 일정이 연속으로 이어지는 상황을 말할 때
Two drops in one week means our test team runs back to back.
응용 연습
I have three vendor calls back to back this morning.
과한 것, 지나친 조치 · 필요 이상의 노력을 지적할 때
If it only changes the power driver, a full four-day regression seems like overkill.
응용 연습
A full regression for a typo fix is overkill.
논쟁 없이 · 미리 정한 기준을 자동으로 적용하자고 할 때
I'd ask one thing in return: if 1.0.1 slips past the eighteenth, we treat that as a formal escalation without debate.
응용 연습
If the crash rate doubles, we roll back without debate.
명확한 기준선 · 협상 여지 없는 명확한 기준을 원할 때
I'd rather have a clear line than a negotiation every time.
응용 연습
Let's draw a clear line for what counts as a blocker.
참고로 말하자면 · 조언이나 의견을 겸손하게 덧붙일 때
For what it's worth, I'd recommend your team installs the development branch on two of those boards now, so you can start compiling the framework against the new kernel headers.
응용 연습
For what it's worth, the older firmware never showed this issue.
좋은 의미로 · 중의적 표현을 긍정적으로 한정할 때
Let's hope it's exciting in a good way.
응용 연습
The results were surprising, in a good way.
더 나은 쪽으로 · 변화가 긍정적임을 말할 때
I'm glad I joined; this changed my September plan for the better.
응용 연습
The new triage process changed our release cadence for the better.